

Installation Guides
Technical Information
Detailed Drawings
Dry-Stack
- BRIKclad - Dry-Stack Technology Drawing
- BRIKclad - Dry-Stack Base Elevation
- BRIKclad - Dry-Stack with Sill to Siding
- BRIKclad - Dry-Stack Section Drawings
- BRIKclad - Dry-Stack and Sill Transitions fo EIFS
- BRIKclad - Dry-Stack with Metal Drip to EIFS
- BRIKclad - Dry-Stack Renovation base
Traditional
- BRIKclad - Traditional Technology Drawing
- BRIKclad - Traditional Base Elevation
- BRIKclad - Traditional with Sill to Siding
- BRIKclad - Traditional Metal Drip to Siding
- BRIKclad - Traditional and Sill Transitions to EIFS
- BRIKclad - Traditional with Metal Drip to EIFS
- BRIKclad - Traditional Renovation base
«
Prev
1
/
2
Next
»


BRIKclad Installation 1: Tools Required to Install

BRIKclad Installation 2: Brick Prep

BRIKclad Installation 3: Sheathing and Wall Prep

BRIKclad Installation 4: Weather Membrane and Flashings

BRIKclad Installation 5: Leveling Angle

BRIKclad Installation 6: Rainscreen

BRIKclad Installation 7: Corner Selection

BRIKclad Installation 8: Lapped Corner for Traditional Mortared

BRIKclad Installation 9: Prominent Face Corner

BRIKclad Installation 10: Quirk Miter Corner

BRIKclad Installation 11: Continue Installing Brick for Traditional Mortared

BRIKclad Installation 12: Mortar Installation

BRIKclad Installation 13: Joint Selection for Traditional Mortared

BRIKclad Installation 14: Shimming for Inconsistent Walls

BRIKclad Installation 15: Transition Points
«
Prev
1
/
2
Next
»
